Barry
Worked on metal siding. J-Trim around windows, worked on back veranda walls.
Worked on metal siding. J-Trim around windows, worked on back veranda walls.
Worked on metal siding and trim on veranda.
1130a - 3p
continued to work on finishing the verandas. Installed more T1-11 siding.
10a - 1p
2p - 6p
Continued to work on Veranda on both the north and south end. Prep work for the siding such as metal siding end caps.
10a - 1230p
130p - 6p
Set up for front veranda roof. worked on finishing panels on back veranda. Installed roof frame for front veranda.
10a - 1p
2p - 5p
Worked on back veranda. Finished metal roofing and worked on some final wood paneling. Leveled front veranda deck to prepare for walls. Installed east walls and temporarily secured them. Set up roof frames and prepped for roof installation.
10a - 230p
330 - 530p
Worked on the back veranda decking, roof and walls. Put on metal roofing and support post.
10a - 11a meeting online in the morning.
11a - 2p set up and frame, cut veranda decking
lunch
3p - 7p finished decking, built wall modules, modified jig, cut, started veranda roof frame
10a - 2p
3p - 7p
Built 2 back veranda modules deck. Built 2 walls. Roughed the deck into place.
11a - 4p
5p - 630p
prepared, cut and Installed metal siding all around the house up to the edges of where the verandas will be. reinforced trimming attachments on inside with OSB. Helped install the east windows.
Arrived 3:30pm - ended 7p. Got up to speed. Not fully effective as I worked with Solar panels because of instruction, but was able to help for a good hour. Then had to get oriented with next task. Started preparing for metal siding.