• 5.5 hr - Dec 16, 2021
    Ken

    3 hr on materials organizing, 2.5 hours on SEH carport

  • 7 hr - Dec 14, 2021
    Ken

    6 on house, 1 on materials storage

  • 4 hr - Dec 13, 2021
    Ken

    Not quite finished carport.

  • 4 hr - Dec 12, 2021
    Ken

    Carport wall panels & batons

  • 4 hr - Dec 11, 2021
    Ken

    Continuing work on Carport. Installing wall panels and batons.

  • 4 hr - Dec 10, 2021
    Ken

    Work on Seed Eco-Home2 - pebble skirt installed.

  • 4 hr - Dec 10, 2021
    Ken

    Workshop - CNC Torch table - Z Babystepping Multiplicator adjusted from 1 to 10. Note Babbystepping only works when nozzle is in motion. If nozzle is stationary, i.e. during delay or waiting - turning controller knob for babbysteping nozzle only moves down whichever way knob is turned.

  • 1 hr - Dec 10, 2021
    Ken

    raking around SEH2 for pebble skirt

  • 1 hr - Dec 9, 2021
    Ken

    1 hour work on Seed Eco-home 2

  • 7 hr - Dec 9, 2021
    Ken

    Work on CNC torch table nozzle speed experiment temporarily aborted due to inability to adjust Z height effectively during cut.

  • 8 hr - Dec 8, 2021
    Ken

    Experimentation of nozzle speeds with 4mm Z height

  • 8 hr - Dec 7, 2021
    Ken

    Continuing experimentation with 3mm and 4mm Z height. 3mm height caused slag splashing and flamed out. Choosing to proceed with 4mm Z height. Next carry out nozzle speed tests.

  • 8 hr - Dec 6, 2021
    Ken

    Continuing to achieve experiment repeatability

  • 8 hr - Dec 5, 2021
    Ken

    Set acetylene pressure to 2psi.

  • 8 hr - Dec 4, 2021
    Ken

    Fixed Z probe perpendicular to cut surface. Continuing Z height experiments.

  • 8 hr - Dec 3, 2021
    Ken

    Attempt to cut blade 5 failed miserably. Step back to reevaluate parameters for perfect cut. Z height experiments.

  • 8 hr - Dec 2, 2021
    Ken

    Blades 3 & 4

  • 8 hr - Dec 1, 2021
    Ken

    Blades 1 & 2 cut

  • 4 hr - Nov 17, 2021
    Ken

    Inspection By DoL.

  • 8 hr - Nov 16, 2021
    Ken

    Calibration of CNC Torch Table continued and workshop tidy up ready for inspection on Wednesday 17th Nov. 2021 by DoL. Jon Miller also on site.