• 18 hr - Nov 28, 2022
    Land

    12 hr drive to pick up car + travel

  • 0.3 hr - Nov 22, 2022
    Land

    Submitted ticket for Savannah.

  • 1.5 hr - Nov 21, 2022
    Land

    MO one call and staking + talking to Dixie Huffaker neighbor

  • 0.7 hr - Nov 21, 2022
    Land

    filing first ticket for One Call and documenting at Missouri One Call

  • 5 hr - Nov 21, 2022
    Land

    8 to 1:30 - One Call, Ram 3500 offer, bank loans, signing papers, got insurance.

  • 0.5 hr - Nov 21, 2022
    Land

    fundraising for December

  • 3.5 hr - Nov 20, 2022
    Land

    Site design + Ram 3500

  • 3.8 hr - Nov 19, 2022
    Land

    Ram search. Up to Assurant warranty.

  • 8 hr - Nov 18, 2022
    Land

    looking for ram 3500

  • 3 hr - Nov 18, 2022
    Land

    12-3 - 3 hours on Ram 3500

  • 1.7 hr - Nov 18, 2022
    Land

    Permit for Savanna driveway - form filled. Rezoned St. Joe to multifamily residential, which can allow as for as many homes as allowed with setback requirements. Dump loads of dirt $200, 15 yards. Second rezone form - R4. This is getting entertaining. Jon discussion. Till 11 AM.

  • 1.5 hr - Nov 18, 2022
    Land

    Savanna visit - 1.5 hr for driveway, electric, shooting elevation at 20 points

  • 0.5 hr - Nov 16, 2022
    Land

    DIY asphalt. Supply co is $65/ton in Indiana. Bio-asphalt!

  • 2 hr - Nov 16, 2022
    Land

    Loan from Indep Farmer's Bank paperwork; access to Savannah. Ameren connection finalization - updating for actual power pole.

  • 4 hr - Nov 15, 2022
    Land

    11 am on - electrical maysville - electrical savannah Dan Huffaker. Workshop logistics and people, Maysville. MO 1 call. Ufer Ground detail. Engineering submission evaluation. Trim on new 1300 sf. Hablab restoration?

  • 2 hr - Nov 14, 2022
    Land

    checked in on permit, title, electrical access savannah, electrical Maysville, and Sewage Ejector, and Line of Credit. No car yet.

  • 3 hr - Nov 14, 2022
    Land

    temp power due diliegence, maysville lot - email to Lisa. Another 2 hrs to do the plan. 3 hr total, should be logging 1.5 for actual time in future.

  • 0.4 hr - Nov 9, 2022
    Land

    Closing docs signed, and wires activated.

  • 0.8 hr - Nov 7, 2022
    Land

    sign, earnest money, and wire to Mayville lot - Cameron title.

  • 0.3 hr - Nov 5, 2022
    Land

    reached out to Alicia and Colby.