Morning: 1:45pm-2:45pm
Helped Ethan install bathroom vent fan
Afternoon: 4pm-5:05pm
Helped Ethan install bathroom vent fan
Morning: 1:45pm-2:45pm
Helped Ethan install bathroom vent fan
Afternoon: 4pm-5:05pm
Helped Ethan install bathroom vent fan
Morning: 10:00am-1:00pm
Removed unnecessary electric box from old position
Installed additional wall studs in bathroom 1 and 2 to mount future divider walls/pocket doors
Helped Ethan with some electric work
Afternoon: 2:55pm-5:20pm
Helped James move heavy items out of storage
Afternoon: 2:30pm-3:30pm
Cleaned out leftover insulation & tools to prepare for drywall installation
Started preparing installation of Minisplit heat pump
Morning: 10:20am-12:05pm
Installed ceiling supports for drywall on short walls
Afternoon: 1:25pm-4:30pm
Installed ceiling supports for drywall on interior walls
Finished all the insulation we aren't blocked on (by minisplit, breaker panel install)
Installed vanity light blocking
Morning: 10:30am-1:25pm
Installed some electric boxes in ceiling
Installed ceiling supports for drywall on short walls
Afternoon: 2:05pm-5:30pm
Finished bio digester cabin roof
Finished ceiling insulation
Continued on wall insulation
Morning: 10:15am-12:20pm
Tried settling bio digester cabin walls with ratchet straps
Installed remaining ceiling insulation
Afternoon: 1:15pm-5pm
Installed wall insulation
Morning: 10:50am-1:00pm
Built & installed roof gutter mesh lath
Afternoon: 2:00pm-5:20pm
Continued bio digester cabin build
Morning: 10:00am-1:18pm
Built bio digester cabin foundation
Transported tools to FeF
Afternoon: 2:35pm-6:00pm
Put up bio digester cabin (70% complete?)
Morning: 10:00am-12:05pm
Finished shingle install! Hallelujah!
Cleaned up & organized build site
Afternoon: 1:30pm-5:15pm
Installed drip cap L-bracket on front veranda
Installed 1x8 white trim over front veranda
Installed vertical 1x6 white trim on front veranda sides
Morning: 10:00am-1:20pm
Cut & installed remaining T1-11 on front porch inside walls
Replaced split front porch plank
Afternoon: 2:35pm-5:20pm
Trimmed shingles to fit cedar trim
Installed cedar shingle trim
Installed shingles once again
Morning: 10:10pm-1:20pm
Installed more shingles (1 week of shingles now!)
Afternoon: 2:25pm-5:50pm
Installed even more shingles
Installed missing rear porch plank
Drove to Menards to pick up materials
Installed yet more shingles
Added some more screws to sheet metal siding
Took T1-11 siding off back porch walls (exterior) to make room for treated plywood
Installed window trim spacer
Started cutting J-channel for window
Installed more shingles
Morning: 10:00am-12:00pm
Drove to FeF to get more materials (gravel, trim boards, interior doors)
Afternoon: 12:00pm-5:40pm
Spread more gravel on roof
Installed more shingles
Morning: -
Afternoon: 12:45pm-5:45pm
Installed some more shingles
Spread some more gravel on the roof
Afternoon: 2:55pm-5:15pm
Continued installing front porch shingles (1/3 done)
Spread gravel on roof (1/2 done)
Morning: 10-20am-1:40pm
Installed front porch shingles
Afternoon: 2:30pm-5:50pm
Installed sheet metal roofing on front porch
Morning: 10:20am-1:10pm
Installed 6x6 posts on front porch